Specimen Construction Phases

Steel bar reinforcement with steel stacked to form structure of building.
Steel Bar Reinforcement
Close up of strain gage placement with steel parts attatched to each other.         Closer view of whole strain gage placement.
Strain Gage Placement
The formwork shows wooden boards attatched to wooden poles.
Formwork
Another view of the formwork from opposite side.
Formwork
A strong wall bar reinforcement and plate mount.
Strong Wall Bar Reinforcement and Plate Mount
Pieces of the Bakaert Steel Fiber are shown with a ruler on top.
Bakaert Steel Fiber
The Superior R.M Design 813865P and Bakaert Steel Fiber.
Superior R.M. Design 813865P and Bakaert Steel Fiber
Placement June 12, 2000. Multiple wooden rectangle shaped figures.
Placement June 12, 2000
SFRC Research CMRI